Home > Showroom

API5l Line Under Sea Project ERW Pipe Nace Mr0175

API5l Line Under Sea Project ERW Pipe Nace Mr0175
Chat Now

Product Details

In the fiercely competitive market, our company adheres to the business philosophy of 'pragmatic, honest, innovative, and efficient', and continues to produce high-quality Waterproof Plastic Lumber, Horse Board, Plastic Joists with a stronger and more professional spirit. We will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers, common development and create a better future. If you are interested in any of our items, please feel free to contact us for quotation and product details. Now, we professionally supplies customers with our main merchandise And our business is not only the 'buy' and 'sell', but also focus on more. Our company adheres to the principle of high quality and customer first, and develops markets with excellent service and flexible business model.


The sea piling is mainly placed near the bridge pier and wharf to guide the ship to mooring and separate the ship from the bridge pier. Compared with wood, absorbing the same impact, the number of round piles is significantly reduced.

Dolphins are used near the piers, for ships mooring or separated from the piers. They could absorb much more impact energy.


image001image003(001)


Application




● TPlastic fender is a new type of water bank collision protection product used in the field of port wharf, embankment, ship edge and pier protection, which is used to prevent or avoid damage caused by collision to ships, wharf, embankment and pier. Application fields are as follows:

● Port wharf protection: replace traditional wooden and rubber fender, and use it as anti-collision pile and protection system for inland river and coastal ports. Bridge pier and river protection: used as a collision barrier for protecting bridge piers and rivers. The impact force is unloaded by elastic buffering and extremely low friction coefficient to ensure maximum protection of bridge piers and vessels.

● Embankment, retaining wall: good weather resistance, no freezing cracking, long service life, high corrosion resistance.

Floating row and floating wood: It can be used as floating material on the shore. It can float on the surface of the water. Length can be customized, single or multiple rows, and the collision force can be used for collision avoidance.

Protection of reclamation, soft soil and marsh construction of reclamation project: good weather resistance, no cracking due to freezing, long service life and high anti-corrosion.

Protective piles and offshore working platforms: excellent anti-corrosion performance, no decay, no rust, no pollution to seawater.

Protection of the ship lock entrance and diversion wall: low friction coefficient, good impact resistance, corrosion resistance and long service life.

Pier corner protection: use the ground rail and the dock retaining edge, and use it with the dock fender.

Density during 0.7-0.9, can float in water, density also can be customized according to needs



FAQ




1. What is the production process? Is there any limit to the length?


We adopt continuously extruded process, no limited to the length, can cut as customer request. length is just limited by the transport.














2.

Is WINSTAR plastic timber environment friendly?




● Plastic fender/pile is a new type of environmental pier protection materials.


● The material adopt recycled plastic. Cut down the plastic pollution


● Application replace wood, WPC, save the resource of the forest


● Can be recycled, no continuous pollution


● Wood need to be antiseptic treatment, antiseptic substance will pollute the water and soil. Winstar recycled plastic will not absorb and exudation any poison, it will not be any pollution to the environment


● Choose high quality recycled plastic, safe and no poisonous.



Today, our company continues to develop and grow, we learn from advanced technology in the same industry and improve it, so that our API5l Line Under Sea Project ERW Pipe Nace Mr0175 has unparalleled superiority. Today, we have a united, young, positive and excellent modern management and sales team. They carry out product research and development, design, production, sales and after-sales service with modern management concept and keen information antennae. We have acquired high-level operation and management capabilities and the spirit of 'hard work, dedication, truth-seeking, innovation, unity and cooperation'.
Hot Tags: sea piling, manufacturers, suppliers, factory, price, Courtyard Decking, Picnic Table, Posts, Sliding Fender, Vinyl Sign Post, Post Fence

Feedback

You Might Also Like